Installation Guide: Step-by-Step Process for Homogeneous PVC Flooring

zzh7563
151 x views • 1 year ago
The constant rise of environmental protection, durability and aesthetics requirements in the modern construction industry has been driving the development of Homogeneous PVC Flooring, gradually made it the preferred flooring materials for commercial industrial field. It is used in many places like hospitals, schools, and airports due to its high wear resistance, slip resistance, and easy-maintenance features. Nevertheless, the performance advantages of Homogeneous PVC Flooring can not be achieved without proper installation and maintenance. Next, this article will explain the installation steps and maintenance techniques of Homogeneous PVC Flooring in detail, so that you can create a durable and beautiful floor environment.

Preparation Before Construction: The Sub-floor Requirements

Sub-floor treatment is one of the steps that must be done before the Homogeneous PVC Flooring installation. Here are the preparatory works required before you start constructing:

Detection of moisture content in sub-floor

The moisture content of the sub-floor must be less than 3%, this is can be determine by a professional instruments. Too much moisture content can lead the floor to swell or the adhesive to give up.

If the moisture content is higher than the standard, it is recommended to use ventilation or dehumidification equipment to treat it until it reaches the standard.

Basics of Self-levelling Treatment

It is essential that the surface of the sub- flooring be smooth, without cracks or indentations. Leveling treatment to use self-leveling cement, floor flatness error ≤ 2mm.

Once the self-leveling is dry, the surface should be polished and wiped free of dust so that there are no residues.

Ambient Temperature and Humidity Control

Ensure the bonding effect of glue, the construction environment temperature should be maintained between 15℃-30℃, and the humidity should be controlled between 40%-70%.



Installation: All Steps from Pre-laying to Welding

To avoid affecting the aesthetics of the floor If Homogeneous PVC Flooring is not firmly neated or the laying area does not meet the requirements, the installation of Homogeneous PVC Flooring is very accurate and effective. These are the steps in detail:

Pre-laying and Cutting

Remove the Homogeneous PVC Flooring material from the rolls and allow it to acclimatize in room for 24 hours to become accustomed to ambient temperature and humidity.

Pre-lay to the room, ensuring that you reserve 5mm-10mm of expansion joint between the floor and the wall.

Gluing and Laying

Spread the special PVC floor glue evenly on the surface of the sub-floor. Do not use too much or too little glue.

Begin laying down the floor from one end of the room, and press each piece of flooring down into the glue to make sure it is in full contact.

Rolling and Degassing

Roll over, using a heavy-duty roller, from the center towards the edges, to eliminate the air between the floor and the glue, until there are no air pockets remaining.

Welding Treatment

Finally, for the longitudinal joint (splice) at the floor joints, use a hot-air welding gun to weld for a firm (beautiful) joints

And after welding, a special tool grinds down the weld line so that it is flush with the floor face.



Daily Maintenance: Extend the Life of the Floor

Daily maintenance of Homogeneous PVC Flooring is very simple, but still need to pay attention to the following points:

Prohibiting Strong Acid Cleaners

High-acid or high-alkaline cleaners will corrode the floor surface, affecting the gloss and service life.For cleaning the floor, neutral cleaners (pH value 6-8) diluted at 1:20 are recommended.

Routine Cleaning and Upkeep

To protect the surface of the wooden floor, you should clean dust and stains every day with a vacuum cleaner or a damp mop as sand may scratch the wooden floor.

Reinforced wax experience for the PVC horn, using a special - PVC floor maintenance agent including the operation:To enhance the wear resistance and gloss of the floor, reuse once every quarter waxing floor.



Renovation Techniques: Repair and Replacement Solutions

Even though Homogeneous PVC Flooring has extremely high wear resistance, it may still have slight scratches or local damage after long-term use. The following are repair and renovation suggestions:

Polishing Repair for Slight Scratches

For slight scratches, a fine-grit sandpaper or a special polishing machine can be used for local polishing, and then apply a color-matching repair agent.

After polishing, clean the surface with a neutral cleaner and wax it to restore the gloss.

Local Replacement for Severe Damage

For severely damaged areas, the damaged part needs to be cut out, and Homogeneous PVC Flooring of the same specification should be used for replacement.

After replacement, use a hot-air welding gun to treat the joints to ensure a seamless connection between the new and old floors.



Conclusion

Homogeneous PVC Flooring, with its excellent performance and wide range of application scenarios, has become an ideal choice for modern building floors. Through a scientific installation process and meticulous daily maintenance, you can maximize the service life of the floor and maintain its beauty and functionality.

If you are looking for high-quality Homogeneous PVC Flooring, HUAJING is your most reliable choice. We offer a variety of specifications and patterns of Homogeneous PVC Flooring to meet the needs of different scenarios, and provide professional installation and after-sales services. Choose HUAJING to make your floor more durable and beautiful!
For more information about Homogeneous PVC Flooring,click here:https://www.hjpvcfloor.com/
Safefileku